Minneapolis-St. Paul-Bloomington, MN-WI · 2026 estimate in 2025 dollars
Dishwasher or Garbage Disposal Installation Cost in Minneapolis, MN-WI
Typical cost$890
Amber bar: Minneapolis, MN-WI low-to-high range. Teal line: national range. White tick: typical.
A typical dishwasher or garbage disposal installation in Minneapolis, MN-WI comes to about $890. That is $150 more than the national median of $740, or 20% higher. Prices here vary a lot by job: the high end ($1,300) is 2.6 times the low end ($500).
How does dishwasher or garbage disposal installation in Minneapolis, MN-WI compare with other places?
Of the 387 metros we cover, Minneapolis, MN-WI ranks 4th from the top on price (1st is the most expensive), tied with 1 other metro at $890.
Minneapolis, MN-WI is more expensive than all of the 2 other Minnesota metros compared below; the closest in price is Green Bay, WI at $850.
The national median is $740, with a middle range of $420 to $1,050.
| Place | Typical | vs Minneapolis, MN-WI | Range |
|---|---|---|---|
| Minneapolis, MN-WI | $890 | - | |
| National | $740 | -17% | |
| Milwaukee, WI | $820 | -8% | |
| Madison, WI | $830 | -7% | |
| Green Bay, WI | $850 | -4% | |
| Sioux Falls, SD-MN | $700 | -21% | |
| Duluth, MN-WI | $830 | -7% |
What local wage and labor cost are behind the $890 estimate?
The estimate uses a median hourly wage of $48.86 for plumbers, pipefitters, and steamfitters in Minneapolis, MN-WI, 1.59 times the national wage for the same trade. Labor is assumed to be 35% of the national price, about $260 of $740. In Minneapolis, MN-WI that labor part is scaled by the local wage ratio (1.59), giving about $410 of labor. The other $480 (materials, equipment and overhead) stays at the national level. $410 + $480 = $890.
Wage source and vintage: see the methodology. All 25 projects for Minneapolis, MN-WI are on its metro page.
What drives the cost of dishwasher or garbage disposal installation in Minneapolis, MN-WI?
- Local labor cost. Labor is about 35% of a typical dishwasher or garbage disposal installation price, and Minneapolis, MN-WI pays $48.86 an hour for plumbers, pipefitters, and steamfitters, 1.59 times the national wage for that trade. That moves the labor part from about $260 nationally to about $410 here.
- Cost index. Minneapolis, MN-WI has a cost index of 1.21 for this project, where 1.00 is the national level; that is why its median sits well above the national figure.
- Job scope. The $500 to $1,300 range is wide, which points to large differences between jobs. This dataset does not break out size, materials or access, so treat the typical figure as a midpoint rather than a quote.
Dishwasher or Garbage Disposal Installation cost in Minneapolis, MN-WI: common questions
How much does dishwasher or garbage disposal installation cost in Minneapolis, MN-WI?
The typical (median) estimate is $890. The middle half of comparable jobs falls between $500 and $1,300.
Is dishwasher or garbage disposal installation more expensive in Minneapolis, MN-WI than the national average?
Yes. The Minneapolis, MN-WI median of $890 is 20% above the national median of $740.
How much of the dishwasher or garbage disposal installation cost is labor in Minneapolis, MN-WI?
About $410 of the $890 typical price is labor, priced at a median $48.86 an hour for plumbers, pipefitters, and steamfitters, and $480 is materials, equipment and overhead held at the national level. The labor part is the national labor share (35%) scaled by the local wage ratio of 1.59.
Where is dishwasher or garbage disposal installation cheapest in Minnesota?
Among Minnesota metros we cover (including those that also span other states), Sioux Falls, SD-MN is cheapest at $700; the most expensive is Minneapolis, MN-WI at $890.
Where is dishwasher or garbage disposal installation cheapest in Wisconsin?
Among Wisconsin metros we cover (including those that also span other states), Fond du Lac, WI, Kenosha, WI and Racine, WI are tied as the cheapest at $790; the most expensive is Minneapolis, MN-WI at $890.
These figures are statistical estimates built from public data (dataset generated 2026-11-25). They are not quotes. Dollar amounts are in 2025 dollars: survey job costs are inflated with the all-items CPI-U, and wages are from May 2025. Get written bids for your own job. How the numbers are made: methodology.