Providence-Warwick, RI-MA · 2026 estimate in 2025 dollars

Landscaping or Sprinkler System Cost in Providence, RI-MA

Typical cost$3,300

$1,400 low$5,750 high

Amber bar: Providence, RI-MA low-to-high range. Teal line: national range. White tick: typical.

+4%vs national median
T-30 / 387Price rank (1 = highest, tied with 50 others)

A typical landscaping or sprinkler system in Providence, RI-MA comes to about $3,300. That is $140 more than the national median of $3,150, or 4% higher. Prices here vary a lot by job: the high end ($5,750) is 4.2 times the low end ($1,400).

How does landscaping or sprinkler system in Providence, RI-MA compare with other places?

Of the 387 metros we cover, Providence, RI-MA ranks 30th from the top on price (1st is the most expensive), tied with 50 other metros at $3,300.

Among the 5 metros compared below, 0 are cheaper, 1 is the same price as Providence, RI-MA (Springfield, MA) and 4 are more expensive. The spread is $3,300 (Springfield, MA) to $3,400 (Boston, MA-NH).

The national median is $3,150, with a middle range of $1,300 to $5,500.

PlaceTypicalvs Providence, RI-MARange
Providence, RI-MA$3,300-
National$3,150 -4%
Worcester, MA$3,350 +2%
Boston, MA-NH$3,400 +2%
Springfield, MA$3,300 0%
Barnstable Town, MA$3,400 +2%
Amherst Town, MA$3,350 +2%

What local wage and labor cost are behind the $3,300 estimate?

The estimate uses a median hourly wage of $21.76 for landscaping and groundskeeping workers in Providence, RI-MA, 1.16 times the national wage for the same trade. Labor is assumed to be 28% of the national price, about $890 of $3,150. In Providence, RI-MA that labor part is scaled by the local wage ratio (1.16), giving about $1,000 of labor. The other $2,300 (materials, equipment and overhead) stays at the national level. $1,000 + $2,300 = $3,300.

Wage source and vintage: see the methodology. All 25 projects for Providence, RI-MA are on its metro page.

$1,000labor in Providence, RI-MA
$2,300non-labor (national level)
$3,300typical cost (labor + non-labor)
$21.76per hour, landscaping and groundskeeping workers
1.16xlocal wage vs national wage
28%labor share of national price
1.04cost index (1.00 = national)

What drives the cost of landscaping or sprinkler system in Providence, RI-MA?

  • Local labor cost. Labor is about 28% of a typical landscaping or sprinkler system price, and Providence, RI-MA pays $21.76 an hour for landscaping and groundskeeping workers, 1.16 times the national wage for that trade. That moves the labor part from about $890 nationally to about $1,000 here.
  • Cost index. Providence, RI-MA has a cost index of 1.04 for this project, where 1.00 is the national level; that is why its median sits above the national figure.
  • Job scope. The $1,400 to $5,750 range is wide, which points to large differences between jobs. This dataset does not break out size, materials or access, so treat the typical figure as a midpoint rather than a quote.

Landscaping or Sprinkler System cost in Providence, RI-MA: common questions

How much does landscaping or sprinkler system cost in Providence, RI-MA?

The typical (median) estimate is $3,300. The middle half of comparable jobs falls between $1,400 and $5,750.

Is landscaping or sprinkler system more expensive in Providence, RI-MA than the national average?

Yes. The Providence, RI-MA median of $3,300 is 4% above the national median of $3,150.

How much of the landscaping or sprinkler system cost is labor in Providence, RI-MA?

About $1,000 of the $3,300 typical price is labor, priced at a median $21.76 an hour for landscaping and groundskeeping workers, and $2,300 is materials, equipment and overhead held at the national level. The labor part is the national labor share (28%) scaled by the local wage ratio of 1.16.

Where is landscaping or sprinkler system cheapest in Massachusetts?

Among Massachusetts metros we cover (including those that also span other states), Providence, RI-MA and Springfield, MA are tied as the cheapest at $3,300; the most expensive are Barnstable Town, MA and Boston, MA-NH, tied at $3,400.

These figures are statistical estimates built from public data (dataset generated 2026-11-25). They are not quotes. Dollar amounts are in 2025 dollars: survey job costs are inflated with the all-items CPI-U, and wages are from May 2025. Get written bids for your own job. How the numbers are made: methodology.